Home / Archives / August 2026 / Articles

CROSS-BORDER DISSEMINATION AND REPORTED APPLICATION OF THE KYERE YEBOAH RELIABILITY MAINTENANCE APPROACH

Authors: IBRAHIM S.

Country: USA

Abstract

This technical evidence review evaluates the specific distribution-maintenance contribution attributed to Bismark Kyere Yeboah at the Electricity Company of Ghana (ECG), its documented institutional recognition beginning in 2019, international professional dissemination in 2025, and engineer-reported organizational adoption in Nigeria and Kenya in February 2026. The contribution under examination is not the invention of reliability-centered maintenance (RCM); rather, it is a practitioner-associated integration of asset-condition observations, outage and failure histories, consequence-based asset ranking, inspection and work-order prioritization, root-cause investigation, and reliability-indicator feedback into a repeatable distribution maintenance workflow. ECG Director of Operations memoranda dated 27 March 2019 and 9 January 2020 explicitly identify Yeboah and direct wider training and continuation. Published Ghana Energy Commission and Public Utilities Regulatory Commission (PURC) reliability series provide aggregate performance context but do not isolate the initiative’s causal effect. Nigerian Society of Engineers (NSE) correspondence documents a featured presentation in December 2025. According to findings attributed to Engr. Adebole, Ikeja Electric formally adopted the approach on 4 February 2026 and Kenya Power on 26 February 2026, incorporating six identified maintenance functions. The underlying implementation records have not been made available to this drafting process; the verifying engineer must confirm record-level details and approve the findings before publication. The evidence supports a differentiated assessment of individual attribution, institutional uptake, cross-border transfer and measurable operational effect.

Keywords

Bismark Kyere Yeboah; reliability-centered maintenance; asset criticality; distribution reliability; ECG; Ikeja Electric; Kenya Power; SAIDI; SAIFI; engineering knowledge transfer.

References

1) Electricity Company of Ghana (27 March 2019). “Management Directive on Training of Engineers by
Mr Bismark Kyere on Reliability Maintenance Techniques.” Director of Operations memorandum,
scanned copy.
2) Electricity Company of Ghana (9 January 2020). “Sustenance of Reliability Maintenance Training and
Improvement in Reliability Indices Across All Operational Regions.” Director of Operations
memorandum, scanned copy.
3) Energy Commission, Ghana (2023). National Energy Statistical Bulletin, Table 3.13, ECG reliability
indices.
4) Public Utilities Regulatory Commission (4 May 2022). Summary of Key Findings from 2022–2027
Multi-Year Major Tariff Proposals Submitted by Utility Service Providers, Table 4-12.
5) Nigerian Society of Engineers (25 September 2025). Featured guest speaker invitation for 58th
International Engineering Conference (supplied correspondence).
6) Nigerian Society of Engineers (8 December 2025). Participation acknowledgment and Certificate of
Appreciation (supplied correspondence/certificate).
7) Engr. Ibrahim (2025–2026). Reported engineering verification of Ikeja Electric and Kenya Power
adoption; full record index, professional credentials and author-approved verification statement
pending.
8) Kenya Power and Lighting Company Plc. FY2024–FY2025 indicators reproduced in earlier
manuscript; not used as post-adoption impact evidence.